Project team intake

Bring the project parameters before the product list.

Tell us about the project type, unit count or area, current phase, specifications, and intended bid timing. File upload is intentionally unavailable until secure storage and retention are approved.

Introduce the planned project

Submitting this form requests a conversation. Product availability, scope, and scheduling are confirmed separately.

The short answer

Bring the unit count, project phase, flooring spec and bid date, and Tidal Flooring returns a written scope for supply and install or install-only labor under CSLB C-15 license #1002910. Multifamily and mixed-use flooring in San Diego turns on sound ratings, slab moisture and sequencing with other trades, so those are settled before any product list.

Project types
Multifamily, mixed use, residential development, ADU clusters, and the residential portion of commercial projects
What to bring
Unit count or area, phase, flooring spec or direction, sound rating requirements, bid timing, and the schedule of other trades
What you get
A written scope for supply and install or install-only labor, a mock-up unit when the project warrants it, and spec help on method and underlayment
Documents
CSLB license verification, certificate of insurance, and W-9 on request; terms in the written agreement
Next step
Introduce the project with the form on this page or call (619) 403-3662

What to bring before the product list

Flooring bids on development work go wrong when the product is chosen before the building is understood. Send the building first: the unit count or total area, the current phase, whether units sit over other units or over garages, and the slab or deck construction. Then the flooring spec or the direction if there is no spec yet, and the bid date you are working to.

Two more items save a round of questions. The sound rating the project requires between units, if it has been set by the architect, the HOA documents or the jurisdiction. And the schedule for cabinets, countertops, paint and plumbing trim, because flooring sequence is a cost line on every unit.

  • ◆Unit count or square footage, by unit type, and the phase.
  • ◆Spec or direction for each room type, and whether install-only labor or supply and install is being bid.
  • ◆Slab, podium deck or wood-framed floor, and any moisture history.
  • ◆Required sound rating between units, any approved underlayment, and the bid date.

Sound ratings and HOA or condo deck requirements

Any hard floor over another unit has to meet an impact sound rating, and the number is set by the architect, the HOA's documents or the jurisdiction, not by the flooring supplier. The common path is a floor system, plank plus underlayment or attached pad, that carries a tested rating equal to or better than the requirement, with the test report filed before installation. We ask for the requirement in writing and return the product and underlayment combination that meets it, with its report.

Condo conversions and existing HOA buildings add a second step: the HOA's approval letter, which usually names the rating, the underlayment and sometimes the installer's license and insurance. Tidal supplies its C-15 license number and a certificate of insurance for that letter. Tile over a deck is the loudest assembly and needs an underlayment rated for tile; engineered wood and luxury vinyl over acoustic underlayment are the usual answers.

Mock-up units and sample approval

On a project with repeated unit types, one unit gets floored first and reviewed before the rest are released. The mock-up proves the product, the underlayment, the transitions at tile and carpet, the stair nosings and the height at doors, and it gives the designer and the developer one place to approve color and sheen under the actual lighting rather than from a sample board.

Sample approval runs the same way for the spec. Physical samples of the finalist products, with their installation instructions, wear layer or tile rating, and sound test report, are reviewed together so the approved spec is one document the purchasing and the install both follow. Lot and color consistency across phases is handled by ordering against that approved spec and recording the lot numbers.

Phasing and sequencing with other trades

Flooring sits late in the finish sequence and absorbs everyone else's delays, so the schedule conversation happens at scope, not at install. The usual order in a unit is cabinets and countertops before floating or glued floors, paint before flooring with touch-up after, and plumbing trim and appliances after flooring. Nail-down hardwood and tile sometimes go before cabinets; the scope states which, per product.

Slab moisture is the schedule risk on new construction. A fresh slab or a podium deck may not be dry enough for adhesive or wood by the date the schedule assumes, and the test result, not the calendar, decides. Testing early and planning mitigation where needed keeps the floor from becoming the trade that holds the certificate of occupancy.

Occupied turnovers run as their own phase: unit access windows, protection of common areas, and products that do not need a cure period before the next tenant are written into the scope.

Documents and the written scope

Before a bid is accepted, Tidal supplies its CSLB C-15 license number, #1002910, for verification on the CSLB site, a certificate of insurance naming the project as required, and a W-9. Swell Contracting's B license, #970145, covers tile and any work beyond floor covering. Pricing, payment terms, retention, delivery handling and schedule commitments are in the written agreement for the project, not on this page.

The written scope lists, per unit type, the product and underlayment, moisture mitigation if the test requires it, prep, installation method, transitions and stair details, and the sequencing assumptions. Market ranges on the store pages do not price development work; the scope does.

Project team questions

Is there a minimum unit count for development flooring work?

No minimum is published here, and we do not invent one. Whether a project is a fit is settled when you introduce it, based on unit count, phase, schedule and what is already booked. Small ADU clusters and single-building conversions are as welcome to start the conversation as larger phases; the written agreement sets any terms that apply.

Can you do install-only if the developer supplies the flooring?

Yes. Tidal measures, preps, installs and trims material the project supplies, under CSLB C-15 #1002910. The product's installation instructions govern the method, and the scope lists anything the building needs that the spec did not include, such as moisture mitigation on a damp slab or an underlayment to meet the sound rating, as separate lines before work starts.

Can you help us meet the sound rating between units?

Yes. Send the required rating from the architect, HOA documents or jurisdiction, and Tidal returns the plank and underlayment combination with a test report that meets or exceeds it. The rating itself is set by those parties, not by us. For HOA approval letters we also supply the license number and a certificate of insurance the letter usually asks for.

Do you do a mock-up unit?

On projects with repeated unit types, yes. One unit is floored first and reviewed by the designer and the developer for product, underlayment, transitions, stair nosings, door heights, color and sheen under the actual lighting. The approved mock-up becomes the standard the remaining units are installed and inspected against, and lot numbers are recorded for consistency across phases.

How do you handle phasing with other trades?

Sequencing is agreed at scope. In a typical unit, cabinets and countertops go before floating or glued floors, paint before flooring with touch-up after, and plumbing trim and appliances after flooring; nail-down hardwood and tile sometimes precede cabinets, and the scope states which. Slab moisture testing happens early because the test result, not the calendar, decides when wood or adhesive can go down.

What documents do you provide for the project file?

CSLB license verification for Tidal Flooring, C-15 #1002910, and Swell Contracting, B #970145, both checkable on the CSLB site; a certificate of insurance naming the project as required; and a W-9. Sound test reports and installation instructions for the approved products are part of the spec package. Payment terms, retention and schedule commitments live in the written agreement.

Planning information, not a quote or an inventory list. Prices are set in a written estimate after a site visit. Last reviewed October 2026.