Hiring a Remodeler in San Diego: License Check, Deposit Limit and What the Contract Must Say

The California rules that protect you when you hire a contractor: how to verify a CSLB license, the $1,000 or 10 percent down payment cap, mandatory contract language, the license bond, and lien notices.

The short answer

In California a home-improvement contractor may not take a down payment above $1,000 or 10 percent of the contract price, whichever is less, and may not be paid for work not yet done or materials not yet delivered. The contract must be written, describe the work and materials, carry the contractor's license number, and include the state's required notices. Check the license free at cslb.ca.gov.

Down payment cap
$1,000 or 10% of the contract price, whichever is less (CSLB)
Progress payments
Only for work done or materials delivered; schedule must be in the contract
Contract
In writing, signed by both parties, copy given before work starts; describes the work and significant materials
Cancel period
Three business days for most home contracts signed away from the contractor's office
License bond
$25,000 bond on file with CSLB for every licensed contractor
Unlicensed work
Allowed only under $1,000 total, with no employees and no permit (since Jan 1, 2025)

Check the license in two minutes

Every contractor who takes jobs over $1,000 in California must hold a Contractors State License Board license, and the board lets you check it free online by number, business name or personnel. The record shows whether the license is active, the classifications held, the bond, and the workers' compensation status. Swell Contracting holds CSLB B #970145 (general building) and Tidal Flooring holds C-15 #1002910 (flooring and floor covering); both are on the Trust Center.

Since January 1, 2025, the exemption for unlicensed work covers only jobs under $1,000 in total labor and materials, with no employees hired and no permit required. A kitchen, bath or flooring project is never inside that exemption.

The down payment rule

California caps the down payment on a home-improvement contract at $1,000 or 10 percent of the contract price, whichever is less, and the contract must say so in bold 12-point type. After that, a contractor can only be paid for work actually completed or materials actually delivered, following a schedule of progress payments written into the contract. A contractor who asks for half up front is asking you to break the rule.

The practical effect is that your money follows the work. Cabinets ordered and delivered to the site can be billed; cabinets not yet made cannot.

What the written contract must include

The CSLB publishes the required contents. The contract and any change orders must be in writing and signed by both parties, and you must receive a signed copy before work starts. It must carry the contractor's name, address and license number, describe the project and its significant materials (the board's own example: name the cabinet manufacturer and model rather than writing 'install kitchen cabinets'), state the price and the payment schedule, and include the mandatory notices.

  • ◆The down payment and progress payment statements in bold.
  • ◆A three-day right to cancel for most contracts signed somewhere other than the contractor's office.
  • ◆The workers' compensation statement (carries it, or exempt with no employees) and the general liability statement.
  • ◆The mechanics' lien warning, explaining the 20-day preliminary notice and why unpaid subcontractors or suppliers could record a lien even after you have paid the contractor.
  • ◆Change orders in writing, signed, before the extra work starts.

Bond, insurance and lien releases

Every licensed California contractor posts a $25,000 license bond with the CSLB. It exists for consumer protection, and a homeowner can file a claim with the surety if the contractor fails to perform. The bond is not insurance for the project, so ask for a current certificate of general liability insurance and confirm workers' compensation covers the crew on your site.

Mechanics' liens are the other protection to understand. Suppliers and subcontractors can send you a 20-day preliminary notice; it is routine, not a sign of trouble. Ask for conditional and unconditional lien releases with each progress payment so the people who were paid cannot later lien the house.

Comparing bids fairly

Two bids with the same bottom line can describe different jobs. Line them up by scope: demolition, framing, plumbing, electrical, waterproofing, cabinets by brand and line, counters by material and thickness, tile allowances, fixtures, glass, paint, permits, dump fees and cleanup. The common exclusions are design, permit fees, appliances and change orders. A design-build firm writes the scope and the drawings before pricing, which is why its number tends to hold.

Common guidance is to hold a 10 to 20 percent contingency for what the walls reveal, and to hold it yourself rather than letting the bid absorb it.

Questions homeowners ask

How much deposit can a contractor ask for in California?

No more than $1,000 or 10 percent of the contract price, whichever is less, on a home-improvement contract. The contract must state the rule in bold. After the down payment, the contractor can bill only for work completed or materials delivered.

How do I check a contractor's license in San Diego?

Use the CSLB's free Check a License page at cslb.ca.gov. Search by license number, business name or a person's name; the record shows status, classifications, bond and workers' compensation. Swell is CSLB B #970145 and Tidal Flooring is C-15 #1002910.

What is the $25,000 contractor bond for?

Every licensed California contractor files a $25,000 surety bond with the CSLB. A homeowner harmed by a contractor's violation of the license law can make a claim against it. It protects consumers; it is not insurance for your project, so also ask for liability and workers' compensation certificates.

Why did I get a preliminary notice from a supplier?

California lets suppliers and subcontractors protect their right to lien by sending the owner a 20-day preliminary notice. It is routine. Protect yourself by collecting signed lien releases from everyone paid at each progress payment.

Can I cancel a remodeling contract after signing?

For most home-improvement contracts signed somewhere other than the contractor's place of business, California gives you three business days to cancel, and the contract must include the cancellation notice. Service-and-repair contracts under $750 that you initiated follow different rules.

What if the price changes during the job?

Changes must be written as change orders and signed by both parties before the extra work begins. A written scope with allowances for tile, fixtures and stone keeps changes to the things you chose, not surprises.

Sources and review date

Market ranges, not a quote. Your price is set at a free in-home estimate. Last reviewed .

Plan your project

Have a project in mind?

Skip the research rabbit hole. Get a realistic planning range, or book a free on-site consultation with one accountable, licensed team: Swell Contracting, CSLB B #970145.